4125 Chestnut

LVL 4125 is a design build 5+1 story multifamily apartment building project that began construction in late 2018 including underground parking and a roof deck. At the time of its construction, it was the largest stick-built modular building in Philadelphia. The 5 modular unit floors are on top of a Type I steel podium. Along with the living units, the building is equipped with a leasing office, fitness center, community work areas, elevators, pet friendly and a community roof deck. Together, the building totals 88,952 SF* at a total construction cost of $15.8M which was completed in less than 12 months.

5 + 1 story multifamily building

75

Modular Units

55,000

Square feet

130

Living Units

Fitness Center
Study Center
Game Room
Green Roof Deck

Project Details

Construction Type:

Type III B (wood framed)

General Contractor:

VBC | Construction

Modular Contractor:

VBC | Manufacturing

Occupancy Use Group:

Multi-Family

Manufacturing Duration:

15 weeks

Construction Duration:

11 months

Manufacturing Cost:

$6MM

Completion Cost:

$15.6MMM